De-con-struction

Construction of the mass decontamination facility at 80 Spadina Avenue has already begun. Here is our domestic preparedness decon strike force in action:

Here is the Bradley six station column shower into which we installed our photometric stereo machine vision system in order to make it function as a touchless sensor operated fixture:

Here are some pictures taken early on at the construction site:

When we built the triage/observation room, we left the protective plastic covering on the smoked lexan walls/windows of the facility. Finally, we peel away the protective plastic covering: